Preliminary Economic Assessment
Preliminary Economic Assessment — Silver Mine — Idaho
Eimco Rail Loader
Roughstock Mining completed a Preliminary Economic Assessment (PEA) for a major silver producer in northern Idaho. The project included 3-D design of transverse and longitudinal long hole stopes, and cut and fill stopes utilizing an existing block model. It also included development design of primary ramps, secondary access, support cut-outs (sumps, electrical cut-outs, etc.). The study also included design of mine infrastructure including vertical ore and waste passes, ventilation passes, backfill infrastructure (sand and paste), and underground utilities.
SUMMARY
The project included providing manpower and equipment requirements, cost analysis for various mining methods including conventional mining, cut and fill, longitudinal, and transverse long hole stoping. The final product was an internal PEA report provided to the client.
Roughstock Mining completed a Preliminary Economic Assessment (PEA) for a major silver producer in northern Idaho. The project included 3-D design of transverse and longitudinal long hole stopes, and cut and fill stopes utilizing an existing block model. It also included development design of primary ramps, secondary access, support cut-outs (sumps, electrical cut-outs, etc.). The study also included design of mine infrastructure including vertical ore and waste passes, ventilation passes, backfill infrastructure (sand and paste), and underground utilities.
PROJECT PHOTOS
More Projects
Gold Exploration in Historic Mining District
Startup Assistance | Geologic Services | Deswik, Vulcan, Autocad, Leica, Trimble
Project development in historic mining district with limited access.
Learn More
Third Party Review — “Fill-the-Mill” Internal Feasibility Study (FS) -- Montana
Feasibility & QP | Vulcan and Deswik Software
Roughstock was asked to provide a third-party review of an internal FS being completed by a major PGM producer.
Learn More
Feasibility Study (FS) - Underground Zinc Mine - Arizona
Mine Management | Feasibility & QP | Vulcan Mine Design and Deswik Scheduling
Feasibility (FS) for major multi-metal mine in Southwestern Arizona.
Learn More