Internal Feasibility Study

Third Party Review — “Fill-the-Mill” Internal Feasibility Study (FS) -- Montana

Underground Mine Ventilation

Third Party Review

Internal Feasibility Study

Third Party Review

Internal Feasibility Study
Underground Mine Ventilation
Long Term Mine Planning
Long Term Mine Planning
Roughstock was asked to provide a third-party review of an internal FS being completed by a major PGM producer who was updating a Life-of-Mine (LOM) plan to increase production to fill the existing mill to capacity. Roughstock personnel completed multiple on-site visits to observe underground conditions and work with company personnel to determine existing conditions and plans to increase production.
Long Term Mine Planning
Long Term Mine Planning

SUMMARY

TYPEUnderground PGM Mine
SIZE2000 tons/day
LOCATIONMontana
SOFTWARE USEDVulcan and Deswik Software
Major areas of focus for the project included the underground mine plan and budget, future mine design, ventilation design, long-hole stoping methods and design, and other potential risk to the plan.
Roughstock was asked to provide a third-party review of an internal FS being completed by a major PGM producer who was updating a Life-of-Mine (LOM) plan to increase production to fill the existing mill to capacity. Roughstock personnel completed multiple on-site visits to observe underground conditions and work with company personnel to determine existing conditions and plans to increase production.
Long Term Mine Planning
Long Term Mine Planning

PROJECT PHOTOS

Life of Mine Plan
Ventilation Design
Historic mine cart from Rough Stock's "Fill-the Mill" mine feasibility study
Underground Mining